Obtain water connection

Procedure

  • Application form (Size: 3.9 MB, Format: PDF, Language: English)
  • Self attested copy of the sanction letter of building plans.

  • Self attested copy of the allotment letter and GPA, if applicable.

  • Demand Draft towards road cutting charges, if any.

  • Certificate from a plumber registered with the Authority.

Download Booklet (Size: 3.9 MB, Format: PDF, Language: English)

Time limit: – 07 working days from the date of receipt of application.

NOTE: It would be preferred to print on A4 sheet.